GXO Logistics, Inc. marked a significant milestone with the opening of its Sant?Antonino site, which officially joins GXO?s network of logistics hubs as a technologically advanced, sustainable, and future-ready facility. Located in the Canton of Ticino, Sant?Antonino represents a strategic hub for GXO, serving as a gateway between Northern and Southern Europe. The site sits at a natural crossroads of international logistics corridors, in a region well connected by highways and rail infrastructure that supports major freight flows.
Further strengthening this strategic position is the rail connection to Swiss Post?s main sorting center in Härkingen, reachable in approximately two hours by train. This link enables smoother logistics flows and contributes to a more efficient and resilient supply chain. With its expansion into Ticino, GXO is strengthening its presence in Switzerland, supported by a multilingual team capable of operating across the country?s four national languages.
Covering 20,000 square meters with 55,000 square meters of total floor space, a height of 15 meters and 20 loading and unloading bays, the Sant?Antonino site supports a future-oriented operating model built around streamlined workflows. Its layout is designed to optimize the organization of activities and the efficient use of space, enabling structured and orderly logistics flows. At the same time, the facility is underpinned by a robust ESG framework.
It holds LEED Platinum and ISO 14001 certifications and is equipped with solar panels spanning 20,000 square meters, with an estimated annual output of 800,000 kWh. In addition, dedicated systems for monitoring energy consumption and waste support a more responsible and sustainable approach to site management.
