The assets had previously been controlled by Serbian parallel structures.

    Kosovo’s rail infrastructure manager
    Infrakos says it has taken full management control of its stations and railway
    properties in northern Kosovo.

    In practical terms, this is a governance
    and infrastructure-control step rather than the launch of a new rail service.
    Infrakos says signs and official markings have now been installed at stations
    in Zvečan, Leposavić, Lešak and Slatina.

    The move matters because northern Kosovo
    has been one of the areas where Pristina’s control over public infrastructure
    has been contested. By taking over these railway assets, Infrakos says it can
    proceed with detailed project planning and work toward bringing the railway in
    this area into full operation under Kosovo’s infrastructure manager.

    © Infrakos
    © Infrakos

    The section is described by Infrakos as
    part of the Corridor X rail axis, linking Kosovo’s network with routes through
    North Macedonia and wider international corridors. For the rail sector, the
    immediate meaning is that Kosovo is trying to place the northern rail
    infrastructure under a single legal and operational authority before further
    modernisation work.

    The operation was supported by Kosovo’s
    government, including Prime Minister Albin Kurti, the interior ministry, the
    economy ministry, the infrastructure and transport ministry, and Kosovo Police.
    Infrakos presents the takeover as a prerequisite for railway rehabilitation and
    future use of the line for freight and wider network integration.

    Join Our Circle of Insiders: Receive the Weekly Digest That Keeps You Ahead!

    Share.

    Comments are closed.