The link will be completely closed from 22:00 to 06:00 (exit ramps will be gradually closed from 20:30, and traffic will be restored from 05:00) on the following nights:
• March 8/9
• March 9/10
• March 10/11
• March 11/12
• March 12/13
The works are maintenance-related; however, due to the importance of this section for international traffic, disruptions in transit should be expected, especially on the Germany–Belgium–Luxembourg axis.
Official diversion routes have been designated for the closure period: ❌ Route S1 (for vehicles coming from Loncin):
A604 → N617 → Fragnée and Fétinne bridges → N633 → N30 → N601 (Quai des Ardennes – Boulevard de l’Ourthe) → E25/A26 towards Luxembourg.
❌ Route B (for vehicles coming from Luxembourg via E25/A26):
N30 → N90 (Meuse riverbanks) → E25/A25 to the Cheratte interchange (E25/A25–E40/A3).
Additionally, during the night works, signage may also be extended to access sections between the “Embourg” and “Chênée” exits and between the Loncin interchange and “Avroy/Laveu” for additional maintenance works.