Once completed, the turbine will be 360m high, equivalent to a 100-storey building. It will be the second tallest structure in Germany, after the Berlin television tower which stands at 368m.

    https://www.euronews.com/2026/04/01/worlds-tallest-wind-turbine-being-built-in-germanys-former-coal-mining-region

    Posted by lgbtqismything

    Share.

    2 Comments

    1. marxistopportunist on

      That’s one way to get around the shortage of people willing to go up these things to service them. Replace the smaller ones with fewer giant ones

    2. Astronaut696 on

      Damnnnnnn. A 360 m tall moving structure. Wonder how much energy it would generate.

      Edit:

      ! GICON say they hope for an annual electricity yield of 30-33 gigawatt hours and electricity production costs of less than five cents per kilowatt hour. This is 220 per cent more than conventional turbines nearby and could supply approximately 7,500 four-person households with electricity.

      That’s so cool