
Once completed, the turbine will be 360m high, equivalent to a 100-storey building. It will be the second tallest structure in Germany, after the Berlin television tower which stands at 368m.
https://www.euronews.com/2026/04/01/worlds-tallest-wind-turbine-being-built-in-germanys-former-coal-mining-region
Posted by lgbtqismything

2 Comments
That’s one way to get around the shortage of people willing to go up these things to service them. Replace the smaller ones with fewer giant ones
Damnnnnnn. A 360 m tall moving structure. Wonder how much energy it would generate.
Edit:
! GICON say they hope for an annual electricity yield of 30-33 gigawatt hours and electricity production costs of less than five cents per kilowatt hour. This is 220 per cent more than conventional turbines nearby and could supply approximately 7,500 four-person households with electricity.
That’s so cool