  1. level crossing removal works as far as I’m aware

    edit: was wrong, the night replacement busses are for xtrapolis 2.0 testing

    edit 2: seems to be a mix of level crossing and xtrapolis 2.0 testing now tat I’ve looked properly

  2. Corn_O_Cob23 on

    And the people here flamed me for saying I’m sticking to my car and I love driving 👀 have fun waiting 50 years while I’ve done my trip and returned in the same time.

  3. ullakkedymoodu on

    The replacement buses are still free, OP. You can see the difference when you spend less on fuel this month.

  4. Flightless_fish82 on

    Genuinely, what possibly makes this many disruptions? I feel like PT is a bus service disguised as a transport service

  5. It’s a cheap and cheerful fun activity for the whole family to enjoy!

    Don’t get lost on the bus!

  6. Longjumping-Drag-570 on

    They did announce this before free public transport was announced.
    Free bus is still pretty dang good.

  7. Already got approval for wfh for 2 weeks as it is during the day. No trains from north melbourne for the first few days. Demolition of tracks and putting up the span for the bridge. Trains returning both ways to the altona loop 25th April

  8. Foodworksurunga on

    They should at least get the Sandringham line running to North Melbourne or Footscray during these works. But they won’t.

  9. WretchedMisteak on

    Free public transport doesn’t mean project activities stop. This would have been happening whether it was free or not.

  10. AcidicMantis on

    People commenting “it’s still a free bus trip” – the replacement bus service was already free.

    I get it OP. It’s frustrating. Especially when they try cramming an entire trains worth of people into 1-2 buses and half the passengers get left behind waiting for the next bus to arrive and the workers have no idea when that’s gonna be

  11. If you want to know the answer, /r/melbournetrains is a good place to ask.

    If you just want to vent…carry on.

    But “What could they possibly be doing for nearly half of the month?” is a weird question. 2 weeks is not a particularly long time for trains to to be replaced by buses.

  12. Reasonable_ginger on

    Excellent way to stress test the system. Seems it’s not holding up very well at all. Anybody know if skybus is included?

  13. HippoIllustrious2389 on

    Level crossing removal. Maddox Rd is getting rail over road finalised, and Champion Rd is getting a new pedestrian and cycling overpass installed and the road is being permanently closed to car traffic

  14. Firstnarrows100 on

    And the thing is that this has been happening on the Williamstown line for nearly two years at regular intervals, with the bus taking almost twice as long as the train (and being twice as smelly despite not thinking that could be possible), and yet i have NEVER, not once seen any work being done on the track between Newport and Williamstown.

    Nothing at all. No maintenance workers, no level crossings to remove, no leaves being picked up from the track.

    It is almost certainly just a cost cutting exercise by PTV.

  15. icemagicforever on

    Yep!
    Confirmed from 15-25 April buses replace trains first to last service, from Werribee to Newport.

    So to get in (and reverse for home), you’re looking at Werribee (or your station) – bus to Newport train station – Trains from Newport station to Flinders St.

    PTV is advising to add approx 1hour to the trip (each way).

    I guess I get to travel up to 5 hours round -trip for free 🤙

  16. starship_captain62 on

    That is free public transport in the most disingenuous sense. When there are so many disruptions that it is virtually unusable, it is not free public transport.

  17. CentreHalfBack on

    This post needs a /s

    Works started and ongoing dont magically get done because network is now free and new users want a trouble free ride.

  18. ProfessionalPeach661 on

    i don’t understand this post, just because it’s free doesn’t mean projects stop?

  19. ![gif](giphy|10hDCVo7lTQlIk)

    Meanwhile I’m off. Luckily for me there’s no hills on my route. ☺️

  20. My boss just told me she spent $198 on a tank of fuel, so if it’s between $198 or a free train replacement bus I’m on the bus. Also since this is partly for a level crossing removal it will hopefully result in less disruptions in the future, as level crossings are awful for possible disruptions

  21. Hobbies-tracks on

    Oh just shu-
    The government does nothing = bad government 🤬
    The government does something = bad government 🤬

  22. newYearnew2025 on

    Honest to God, what are people expecting? Expecting work to stop? At least its happening when its free. How much would people complain if they were paying.
    Just be grateful youre not in Iran right now, with threats from Trump to bring your civilisation to an end only 12 hours ago. Perspective people.