Share.

2 Comments

  1. iBinChickenAboutYou on

    * A promised **pocket park in Brisbane’s cultural precinct** — on land owned by **Queensland Rail** near *Grey Street and Melbourne Street* — **was never built**.
    * Instead of becoming green space, the site has been used as a **car park**, frustrating local planners and community advocates.
    * The article explains there’s a **dispute (“stoush”) between the Queensland Government and local council** over why the park wasn’t delivered, including disagreements on responsibility, planning commitments and urban development priorities.
    * It highlights tensions between state-level land controls and local expectations for public open space in inner-city precincts.
    * [https://www.brisbanetimes.com.au/national/queensland/the-state-v-council-stoush-over-an-undelivered-pocket-park-20260218-p5o39i.html](https://www.brisbanetimes.com.au/national/queensland/the-state-v-council-stoush-over-an-undelivered-pocket-park-20260218-p5o39i.html)

  2. If I’m reading correctly:

    Queensland Rail owns the site.

    There was reportedly an agreement to transfer the land to council.

    Council says the state retracted that agreement in 2023.

    Without the transfer, council cannot deliver the park.

    The land was reinstated to its previous function as a car park once Metro works ended.

    So the park never materialised because the land was never handed over from State Govt, even though both Labor state MPs and local LNP Schrinner both advertised it.

    This is backed up by QLD Rail:

    >”The site was handed back to Queensland Rail in October 2025 and, as part of the condition of that arrangement, the contractor reinstated areas of bitumen and line marking in the car park area,” she said.
    >
    >“Queensland Rail is considering its current and future operational requirements for the site, which is primarily used for car parking for South Brisbane station operators.